Intake Library

Intake Library - refurbishment & extension to library and construction of childrens play area                 

Client: 

Architect: 
Start Date:
Completion Date: 
Value:  
Doncaster Metropolitan Borough
Council
Doncaster MBC
January 2006
August 2006
£690,000

 

 

 

 

 

   

 

 

Project Description

Construction of single storey extension with Metsec roof and cladded finish with brick and block cavity walls.

Alterations and refurbishment to existing Library, including provision of Metsec roof.

Construction of soft play children's playground.

The blockwork was constructed using the Celcon thin joint system.  This enables blockwork to be constructed to a maximum of 2.4m in one day.

 

Challenges

A Metsec roof was installed to the existing flat roof extension.

Water integrity of the existing building was maintained throughout by installing a lightweight steel Metsec pitched roof structure over the existing flat roof, which was enclosed in steel cladding.

This system imposed minimal loads on the existing timber framed building.

 



Download the project write up in PDF formatpdf icon

 


 


  
 
   Construction Skills Certification Scheme
.....Quality Built In  
Click to view brochure 

 

Inspirational Homes brought to you by Holme Hall Developments, Built by O&P Construction

Be Inspired...

Visit Holme Hall Developments website