Construction of fifteen apartments at the High Street, Dodworth, Barnsley
Client: Consultant Designer: Completion Date: Value: | Hallroyd Homes Building Design Services June 2008 £900,000 |
Project Description
The construction of a block of six apartments over two storeys, and a block of nine apartments over three storeys.
These were built in a traditional manner with stone facades and artstone.
Challenges
The developer, who employed us to build the apartments, was constructing four bungalows at the bottom of what was a small site. We had control over site security and the site entrance. Deliveries and materials had to be carefully planned and stored to ensure a material build up did not occur, which would affect site access and logistics, and to ensure materials did not get miss-placed.