Quality Built In

Contact: 01709 761600

Email: mail@opconstruction.co.uk

Hungerhill Dance SchoolHungerhill Dance Studio – construction of dance studio

Client:
Consultant Designer:
Start Date:
Completion Date:
Value:
Hungerhill School
G M Clay Architectural Designs Ltd
June 2009
September 2009
£220,000

Project Description

The construction of a steel framed single story building with cladded roof and brick and block external walls, aluminium entrance doors and windows.

The installation of a sprung floor, floor to ceiling mirrors and ballet bar, heating and cooling air conditioning, electrical installation, decoration and floor coverings.

Challenges

Access to the site was extremely difficult due to the works being to the rear of the school. A temporary hardcore access road was constructed for site vehicular access. This was constructed over a weekend to avoid disruption to the school activities. Temporary footpaths were installed to enable pupils to access classrooms safely without having to walk immediately adjacent to the site.

It was essential that the new facility tied in with the existing structure, and looked like part of the original sports hall. This was achieved through exhaustive research by our management team, into the exact specification of the bricks and materials used in the existing structure.



Download the project write up in PDF format
pdf icon


Please click on thumbnails to enlarge – When viewing images, please hover over and click the image to view next or previous.